currentproject
completeprojects
 
  Konsortium Temokin Vila Jelas
JV Sdn Bhd
 
 
 
  Temokin Energy Sdn Bhd  
   
  Temokin Trading Sdn Bhd  
   
  KTV Machinery Sdn Bhd  
 
 
List of Completed Projects (Infra Structure)
List of Completed Projects (Buildings)
List of Completed Projects (Pipe Jacking)
 
List of Completed Projects (Pipe Jacking)
 
No
Description
Client / Employer
Consultant
Commencement Date
Completion Date
1

Construction of Branch SewerPipeline Network in North Central District of Jeddah, Kingdom of Saudi Arabia

WWE Holdings Bhd

 

October 2005

November 2006

2

Construction of KL Sewage Treatment Plant Project Phase 1 Package 1 Sewer Networks (Pipe Jacking for Dang Wangi Sewer Diversion)

Jabatan Perkhidmatan Pembetungan

Erinco Sdn Bhd

June 2005

January 2007

3

Proposed Construction and Completion of Branch Sewer Pipeline Network in North Central Districts of Jeddah, Kingdom of Saudi Arabia

WWE Holdings Bhd

Katib Alami

October 2005

November 2006

4

Construction of Main Drainage through Pipe Jacking @ Bulatan Cheras- MRR1, K.L

TNB Shah Alam

Pintas Bina S/B
Dewan Bandaraya Kuala Lumpur

September 2003

March 2004

5

Construction of Box Culvert of from Jln Krian of Tmn Rainbow Jln Ipoh to Sg. Batu, K.L

TNB Shah Alam

Pintas Bina S/B
Dewan Bandaraya Kuala Lumpur

July 2003

October 2003

6

Supply and Lay 1100mm finished Internal Diameter Mild Steel Treated Water Pipeline from Boon Siew Development Tee-off Point to Bukit Mahkota and Seri Putra Tee-off Point (Stage 2) – Pipe jacking Works (1.8m dia.) with three Crossing to Cross Highway (LLM), Railway (KTMB) 

F.C.Y. Construction Sdn Bhd

Jurutera Perunding Tegap Sdn Bhd

January 2000

June 2000

7




a)

b)

c)

Sungai Selangor Water Supply Distribution Supply System Klang and Kuala Lumpur Package 5B – Pipe Jacking works for Package 3.
Pipe Jacking across New North Klang Straits Bypass Toll Expressway (1.7m dia.)
Pipe Jacking across Jln Sg Putus (1.4m dia.)
Pipe Jacking across Lebuhraya Persekutuan (1.4m dia.)

Pakatan Perakbina Sdn Bhd


Puncak Niaga (M)

Turkey Project SPYTL

 

Ranhill Bersekutu

May 1990

 


March 1999

August 1991

 

December 2000

8

Project Express Rail Link Kuala Lumpur-KLIA
Pipe Jacking across Railway
STAR LRT (CH5500)(1.8m dia.)
Horizontal Directional Drilling (HDD) Across Railway KTMB (CH9800)

YTL Civil Engineering Sdn Bhd

Maunsell Sharma & Zakaria
Sdn Bhd

November 1999

February 2000

9

Gebeng and Kuantan Port Common Piperack at Kuantan, Pahang. Underground Tunnels for Pipelines at Highway Crossing

Dialog Holdings Sdn Bhd

K.K. Perunding

October 1998

March 1999

10

Kerteh Centralised Tankage Facility at Kerteh, Terengganu Underground Tunnels for Pipeline at Highway Crossing using Pipe Jacking Method
(2100mm dia. X 260m long)

Dialog Holdings
Sdn Bhd

 

K.K. Perunding

May 1998

November 1998

11

Installation of Pipe Culvert ,Jacking Method from Jalan Kampong Atap to Sg. Klang K.L (1800mm diam. x 320m length )

Dewan Bandaraya Kuala Lumpur
Jalan Raja Laut
50350 Kuala Lumpur

Dewan Bandaraya Kuala Lumpur
Jalan Raja Laut 50350 Kuala Lumpur

January 1998

June 1998

12

Replacement ARMCO pipe with Pipe Culvert of ( 1800mm dia. X 770m long ) with jacking method near Muzium Negara and Jalan Travers ,KL

Dewan Bandaraya Kuala Lumpur
Jalan Raja Laut
50350 Kuala Lumpur

Dewan Bandaraya Kuala Lumpur Jalan Raja Laut, 50350 Kuala Lumpur

March 1997

February 1998

13

Pipe Jacking at Batu Gajah Melaka (1500mm dia. X 40m dia.)

Chun & Foo Cement Precast Construction

Perunding Aidid Sdn Bhd

December 1996

March 1997

14

Pipe Jacking at KM 43.3 di Jalan Persekutuan, laluan 1 Daerah Hulu Selangor

D’Kasamo (M)
Sdn Bhd

JKR Hulu Selangor

March 1996

May 1996

15

Pipe Jacking works of 1500mm dia. x 40m length @ lot PT 15783, Bukit Kemuning Klang for Telikom Buildings

Perspec Prime(M) Sdn Bhd

Hussein & KH Chong Sdn Bhd

March 1996

March 1996

16

Design & Build Concepts for Pipe Jacking Works Across KTM Reserve & Jalan Kuching Adjacent to JPA Complex Jalan Tun Ismail, Kuala Lumpur (2100mm dia. X 125m long)
(Under Wira Ehsan Sdn Bhd)

JKR Wilayah Persekutuan

K.K. Perunding

November 1994

July 1995

17

Pipe Jacking Works Crossing Railway at KM 374 IJ, Mukim Batu, Daerah  Gombak, Selangor (2100mm. dia. 45m long)
(Under Wira Ehsan Sdn Bhd)

Palm Grove Housing Sdn Bhd

TC & Associates

May 1995

August 1995

18

Pipe Jacking in Sungai Buluh Johor Bahru Water Privatisation (1800mm dia. and 1950mm dia.)

Active Review
Sdn Bhd

Ranhill Bersekutu
Sdn Bhd

November 1994

March 1995

19

Pipe Jacking in Ulu Tiram Johor Bahru Water Privatisation
(1500mm dia. And 1350mm dia.)

Active Review
Sdn Bhd

Ranhill Bersekutu
Sdn Bhd

May 1994

October 1994

20

Pipe Jacking across Negeri Sembilan Railway/KTM line (1500mm ID and 1800mm ID)

Hong Leong Property

Berakan Bersekutu
Sdn Bhd

April 1994

August 1994

21

Pipe Jacking across KTM Railway Line for Alor Setar Town Drainage Scheme (1.8m dia.)

Low Then &
Sons Sdn Bhd

Syed Mohd, Hooi & Binnie
Sdn Bhd

March 1994

May 1994

22

Pipe Jacking across Senai Highway, Johor Bahru (Twin 1.8 dia.)

Bina Baik
Sdn Bhd

Lee & Ooi Consultant

March 1993

December 1993

23

Pipe Jacking across KTM Line (2.2m dia.) for Gasing Indah, Petaling Jaya

Golden Hope Berhad

Bina Runding
Sdn Bhd

October 1992

January 1993

24

Pipe Jacking Associated Works for KTM (1.9m dia.)at Nilai Negeri Sembilan

Arab-Malaysian
Development Berhad

Perunding Cahaya Sdn Bhd

September 1992

December 1992

 
 
© 2009-2013 TEMOKIN HOLDINGS SDN. BHD.